fa-IRen-US
Technical Articles
Technical content
Water canals
Saturday, August 26, 2017 by مدیرمحتوا

Installation of horizontal water canal

In This phase which is one of the main stages of waterproofing. the waterproofing is install in 2 layers and place inside the canal.for least 30 cm

1.Tile or Ceramic
2.Concrete
3.Waterproofing
4.Primer
5.Substructure
6.Slipping
7.Layer
8.Waterproofing
9.Drain


Offered waterproofing: T400, P400, T300

All rights reserved for Azarbam Co.
Name
Last Name
E-Mail

Save Information


 
 
 
Register Forgot Password ?